July Exploration: Fuentona de Muriel – Spain
UTD team will meet for two days of exploration at the beautiful Fuentona de Muriel cave.
Team will perform safety maintenance on the main line, will work on the topography and will seek to reach the bubble.
Access to dive is restricted to those with valid permits.
Minimum training: UTD Cave 1 and UTD Cave 2 and Tech 1 or Cave 3 for the deep part.